BAM Nuttall
Contract: Formwork & Reinforced Concrete to Sea Defences, Ceredigion.
"Through collaboration Trueform overcame all of the technical issues and safety requirements of this challenging project"
Ray Jones, Project Manager
Bam Nuttall case study
Besix Kier
Contract: Precast Reinforced Concrete Contract in Pembrokeshire.
"Trueform came up with innovative ideas for the formwork and falsework systems which ensured that this project was delivered on time and to the highest quality"
Phillip Miles, Project Manager
Besix Kier case study
Costain
Contract: Formwork, Reinforcement/Concrete to Bridge, Pembrokeshire
"Trueform formed an extension of our team and helped to ensure the project achieved an award for constructing excellence"
Dave Morris, Structures Agent
Costain case study
OPCO
Contract: Diamond Drilling for a prestigious residential development.
"This was an extremely rushed and pressurised job, Trueform had men and equipment on-site same day"
Johnathan Williams, Project QS
OPCO case study